That was Thursday, on Friday I did the same duty and morning went by with no problems, lunch went by with no problems, then early afternoon someone knocked some scaffolding down in Newton Bus Station and the place was closed for an hour while all the poles were moved out of the way and buses were all over the place. Then at one stage I picked up 40 students from South Devon College followed by 40 pupils from Paignton Community College plus 10 others and was heading for the bus station where any other 50 passengers awaited me when this happened. An other of the "I can park anywhere."brigade.
As the controller said when I reported the problem, "That's all we need." I bet he was thinking a little more that that. I know I was. When the driver turned up he did say "Sorry, didn't know buses came down here."
There is a story in the local paper about the scaffolding and how it came to be knocked down. The photo shows the scaffolding and a parked car on the other side of the exit road. The car wasn't there on Friday, it was a van that was parked there. An other contributing factor is the length of time it has taken for the toilet block to be built. I have a photo of the silver birch tree cut down in September and the first photo showing building going on was taken Oct 25. For a building 10 feet by 10 feet by 12 feet high that seems pretty slow. If the Great Wall of China had been built at this speed it would be a mile and a half long and not visible from the next hill never mind from space.
Not a great deal of room here for a double decker.

